The BU-D05 / BU-D05ST1 development well was drilled from the BU-DPP platform by the Ensco 104 jackup rig. BU-DPP is located in the western half of the Bayu-Undan gas condensate field which is in the Production Sharing Contract (PSC) areas of JPDA 03-12 and JPDA 03-13, North Bonaparte Basin, Timor Sea, offshore Northwest Australia.
The location is approximately 250km south of East Timor and 480km northwest of Darwin. ConocoPhillips (03-12) Pty Ltd is the operator. The Ensco 104 jackup drilling rig (previously the Chiles Discovery) was on contract on the Bayu-Undan Field on 1st May, 2002 following the completion of drilling, completion and flow testing operations on the BU-WP1 platform. The rig was towed to the BU-DPP platform jacket where it was pinned on location on 23rd July, 2003. The BU-D05 well was spudded on 14th September 2003.
FORMATION TOPS: | BU-D05 | ||||
Formation Name |
(m) | TVDRT (m) | TVDLAT (m) | Thickness (m) | Comments |
Sea Bed |
|
|
| - | |
Oliver Formation |
|
|
|
| |
Hibernia Formation |
|
|
|
| |
Hibernia Marl |
|
|
|
| |
Grebe Sandstone Member |
|
|
|
| |
Johnson Formation |
|
|
|
| |
Intra Johnson J1 |
|
|
|
| |
Johnson Marl |
|
|
|
| |
Upper Turnstone Formation |
|
|
|
| |
Middle Turnstone Formation |
|
|
|
| |
Lower Turnstone Formation |
|
|
|
| |
Vee Formation |
|
|
|
| |
Wangarlu Formation |
|
|
|
| |
Darwin Formation |
|
|
|
| |
Darwin Radiolarite |
|
|
|
| |
Echuca Shoals Formation |
|
|
|
| |
Flamingo Group |
|
|
| - | |
TOTAL DEPTH |
|
|
| - |
FORMATION TOPS: | |||||
BU-D05ST1 | |||||
Formation Name |
(m) | TVDRT (m) | TVDLAT (m) | Thickness (m) | Comments |
Middle Turnstone Formation |
|
|
|
| |
Lower Turnstone Formation |
|
|
|
| |
Vee Formation |
|
|
|
| |
Wangarlu Formation |
|
|
|
| |
Darwin Formation |
|
|
|
| |
Echuca Shoals Formation |
|
|
|
| |
Flamingo Group |
|
|
|
| |
Elang Formation |
|
|
| - | |
RA2.3 |
|
|
|
| |
RA2.2 |
|
|
| 3.1 | |
RA2.1 |
|
|
|
| |
RA1.5 |
|
|
| 5.5 | |
RA1.4 |
|
|
| 5.3 | |
RA1.3 |
|
|
|
| |
RA1.2 |
|
|
|
| |
RA1.1 |
|
|
| 6.8 | |
WD2.3 |
|
|
| 8.9 | Target T19A |
WD2.2 |
|
|
| 7.0 | |
WD2.1 |
|
|
| 4.5 | |
WD1 |
|
|
|
| |
Plover Formation/IC4 |
|
|
| 1.7 | |
IC3 |
|
|
| - | |
TOTAL DEPTH |
|
|
| - |
Drill Cuttings
(Measured depths referenced to RT 58.0 m)
Ditch cuttings spot samples for geological description were caught at 10 m intervals in the16” hole section between 844.0 and 2460 mMDRT. Composite washed and dried ditch cutting samples were collected for storage in the 12 ¼” and hole section between 2460.0 m and 4598.0 mMDRT.
A ditch cuttings sampling summary is listed in table 1.
Table 1. BU-D05 Ditch Cuttings Sampling Type and Frequency
Interval mMDRT | Sample Frequency | Sample Type | Distribution |
137.4 to 844.0 844.0 to 2460.0 2460.0 to 4598.0 | None 10 m 10 m | No returns Spot Samples Washed & Unwashed | Unwashed: ConocoPhillips 1 set East Timor Gov’t 1 set Washed: ConocoPhillips 1 set East Timor Gov’t 1 set Geoscience Aust. 1 set |
BU-D05ST1
(Measured depths referenced to RT 58.0 m)
Composite washed and unwashed ditch cuttings samples were collected for storage at 10
and 3 m intervals in the 10 ⅝" x 12 ¼", 8 ½” and 6 ¾” hole sections, between 2461.0 and
4971.0 mMDRT.
Table 2. A ditch cuttings sampling summary.
Interval mMDRT | Sample Frequency | Sample Type | Distribution |
2461.0 to 4335.0 4335.0 to 4971.0 | 10 m
3 m | Washed & unwashed
Washed & Unwashed | Unwashed: ConocoPhillips 1 set East Timor Gov’t 1 set Washed: ConocoPhillips 1 set East Timor Gov’t 1 set Geoscience Aust. 1 set |
Hydrocarbon Shows
Gas shows are summarized.
Cores
No conventional cores were cut.
Sidewall Cores
No sidewall cores were acquired.
LOGGING AND SURVEYS
LWD Logging
BU-D05
(Measured depths referenced to RT 58.0 m)
Sperry-sun Drilling Services ran the open hole LWD logs that are summarized.
Table 3. BU-D05 Open Hole LWD Logging Suites and Intervals
Run | Hole Size | Tool String | Interval (mMDRT) | Comments |
100 | 36.00 | No tools in hole | 137.4 - 141.4 | No MWD tools in hole |
200 | 36.00 | No tools in hole | 141.4 - 173.9 | No MWD tools in hole |
300 | 26.00 | DWD | 174.4 - 844.4 | Run only Directional tool |
400 | 16.00 | DDS-DIR-GR | 844.4 - 1382.0 | |
500 | 16.00 | DDS-DIR-GR | 1382.0 - 1400.0 | |
600 | 16.00 | DDS-DIR-GR | 1400.0 - 1931.0 | |
700 | 16.00 | DDS-DIR-GR | 1931.0 - 2160.0 | |
|
|
|
| |
|
|
|
| End of LWD run taken as time of twist off – 23/10/04. |
BU-D05ST1
(Measured depths referenced to RT 58.0 m)
Sperry-Sun Drilling Services ran the open hole LWD logs that are summarised in Table 4.
Table 4. BU-D05ST1 Open Hole LWD Logging Suites and Intervals
Run | Hole Size | Tool String | Interval (mMDRT) | Comments |
1000 | 12.25 | DDS-DGR-Dir | 2461.0 - 2578.0 | |
1100 | 12.25 | DDS-DGR-Dir 1200 | 2578.0 - 4435.0 | |
1200 | 8.50 | DIR-CNP-DGRDDS- EWR-SLDACAL- BAT | 4335.0- 4484.0 | One transceiver in ACAL tool suspected to be damaged. Calliper processed using pseudo calliper from Density tool |
1300 | 8.5 | 4674.0 – 4674.0 | No tools in hole | |
1400 | 6.75 | DIR-RES-DGRALD- CTN | 4674.0 - 4971.0 |